Prefabrication and assembly of pipelines

Prefabrication and assembly of pipelines

Prefabrication and assembly of pipelines


Agreement term: 01.05.2019 - 07.07.2020

Scope of work

  • Prefabrication and assembly of pipelines on the object part: ZZU Mikołeska; ZZU Mierzęcice; ZZU Żyglin (testing of anti-corrosion insulation; excavations and backfilling with ZZU)
    L485ME; L485QE; L360QE; L415QE; P420NH; L415ME; L360NE steels
  • High pressure gas pipeline DN1000 MOP 8.4MPa from the Tworóg node to the Tworzeń node as part of the construction of the Hermanowice-Strachocina-Pogórska Wola-Tworzeń-Tworóg-Odolanów gas pipeline.

Standard of execution

  • EN