Modernisation of Pipeline Systems
Scope of work
Replacement of high-pressure pipeline systems in the Hydrocracking Installation of PKN Orlen S.A. in Płock, including:- Welding Methodologies (WPS, WPQR)
- Prefabrication
- Heat treatment
- NDT
- Office of Technical Inspection (UDT) approval
- Transport to the assembly site
- Disassembly of the existing pipes
- Assembly of the prefabricated pipelines
- Insulation
- Pressure tests
- Assistance with installation commissioning
Materials
Inconnel – Alloy 625
Working pressure
230 Bar
Mass
60 000 kg