Absorption tower with piping

Absorption tower with piping

Absorption tower with piping


Agreement term: 05.08.2019 - 31.10.2019

Scope of work

  • Prefabrication and assembly of an absorption tower with a Ф 6.680 mm demister H- 9000 mm Steel 305 L
  • Prefabrication and assembly of piping systems made of special ZeCor steel

Standard of execution

  • ASME + EN