Absorption tower with piping
Agreement term: 05.08.2019 - 31.10.2019
Scope of work
- Prefabrication and assembly of an absorption tower with a Ф 6.680 mm demister H- 9000 mm Steel 305 L
- Prefabrication and assembly of piping systems made of special ZeCor steel
Standard of execution
- ASME + EN